_SLIDE_1_
Green Supply Chain Management
_SLIDE_2_
Contents
What is the GSCM
Problems
What is a ¡°Green Supply Chain Management¡±
Introduction of POSCO
GSCM of POSCO
- High efficiency motor
- Reuse of Slag
- CO2 Separation Technology
- Energy Efficiency Improvement
- Carbon Management System
- Eco-friendly Steel
4. Problem & Proposal
_SLIDE_3_
What is the GSCM
Problems
What is a
¡°Green Supply Chain Management¡±
1
_SLIDE_4_
GSCM
What is a GSCM
Integrating Environmental Thinking into Supply Chain Management, including
Product design
Material sourcing and selection
Manufacturing processes
Delivery of the final product to the customers
End-of-life management of the product after its useful life
_SLIDE_5_
Tax deduction
Energy-saving facility investment tax deduct¡¦(»ý·«)
|
durable year 1.2 times
High efficiency ¡æ BET(6~15 month)
Low noise, Low shaking
Low variable costs
_SLIDE_13_
Time
Cost
BET
(6~15 month)
New motor
Existing motor
4,046
3,012
(Thousand won)
Fixed Cost
Variable Cost
New Motor
£Ü4,046
£Ü2,596
Existing Motor
£Ü3,012
£Ü3,012
Invest in High Efficiency Motor
_SLIDE_14_
The Conception of Slag
Occurrence of Slag
Raw Materials
Products
Slag
_SLIDE_15_
The Conception of Slag
Problems of Slag
_SLIDE_16_
Examples of Reusing Slag
_SLIDE_17_
The Withdrawal of Slag¡¯s Sensible Heat
_SLIDE_18_
Slag Forest beneath the Ocean
_SLIDE_19_
Effect of Reusing Slag
Greenhouse gas reductions
Division
Automotive High Strength Steel
Less-Iron Loss Electrical Steel
Quenched Blast Furnace Slag
CO2 reductions
631
2,600
5,021
Sales
(1,000ton)
783
441
6,396
_SLIDE_20_
CO2 Separation Technology
POSCO has focused developing a new techonology to
reduce CO2 emissions dramatically
S